Building Survey

 

On:

 

 

 

 

 

 

 

 

 

 

 

 

 

 


CONTENTS

1     Summary   2

Property   2

Brief overall assessment   2

Serious defects   2

Essential repairs   3

Other repairs   3

Further investigation   3

Environmental matters   4

Matters for your Solicitor   4

2     Instruction   5

3     Survey Report   6

Exterior   6

Interior   9

Services   12

Grounds   13

Structural risks   14

4     Terms & conditions   17

 

1  Summary

Property

 

Property address

 

Brief description

The property is a substantial semi-detached Victorian house built of brick elevations beneath a pitched concrete tile covered roof supported with timber trusses.  Living accommodation is on three floors.  The property has a small garden area which is largely concrete hardstanding and a detached concrete panel single garage.

Property type

Semi-detached house.

Year built

Approximately 1900.

Accommodation

Ground floor:  three reception rooms, kitchen.

First floor: four bedrooms, bathroom with wc.

Second floor: two bedrooms, bathroom with wc.

Cellar comprising five chambers.

Outside: detached single storey garage, garden largely laid concrete hardstanding.

Tenure

We assume the property is freehold.

Size in square metres

450 m2

Insurance reinstatement cost

£470,000

Brief overall assessment

 

The property has been neglected in recent years and there is considerable scope for improvement and refurbishment.  The main areas of concern were the roof which was leaking, the rainwater goods and rising and penetrating dampness.  There has been some minor movement in the past, however this is not considered significant.

Risk of future movement

In my opinion this is considered low.

Serious defects

 

Main roof coverings

The roof surface was in particularly poor condition and a major overhaul is required replacing slipped and broken concrete tiles, re-bedding and re-pointing ridge tiles and verges. Once an inspection has been carried out of the valley gutters, no doubt these will require re-lining also.  The lead upstand flashings where the two-storey section meets the three-storey brick wall will also require a major overhaul, repairing and replacing lead flashings.

 

It may prove cost-effective to re-roof the whole property.

Secondary roof coverings

Re-cover all the secondary roofs.  Note:  mineral felt and ‘flashband’ type coverings only have a limited life and are only viewed as temporary repairs.  These areas should now be re-covered.

Roof drainage

The gutters and downspouts should be replaced and the grids and gullies cleared and grids provided.

Guideline budget

£6,000

Essential repairs

 

Chimney Stacks

Re-point the front left-hand chimney stack and overhaul the lead flashings, replacing missing sections.

Walls, Partitions and Plasterwork

To the front elevation the brickwork will require re-pointing to alleviate the internal problems with penetrating dampness; these areas should then be replastered. 

 

 

 

Guideline budget

£2,000

Other repairs

 

Eaves, Fascias and Soffits

Overhaul or replace timber fascias.  It may prove cost-effective to replace these with modern uPVC sections which do not require any ongoing maintenance.

Windows

Replace the blown sealed double glazed units and re-paint timber frames to the windows.

Ceilings

Re-plastering the damp ceilings will be required following repair of the roof surface.

Basements and Cellars

A thorough clear out and overhaul of the cellar is required, removing debris and temporary hardboard cladding, generally improving ventilation, clearing the debris and waste timbers.

Interior Doors

Overhaul of the internal doors and locking mechanisms required.

Staircases

The handrail and newel post was a little loose and requires some re-fixing.

Built-in and Kitchen Fittings

Replace the dated and poorly maintained kitchen.

Sanitary Fittings

The sanitary fittings throughout the property should be replaced as these have now reached the end of their useful life.

Mechanical Ventilation

Extractor fans are required to the bathroom and kitchen areas.

The Site

The garden areas should be cut back and maintained.

External Areas/Patios/Paths etc

Consider re-laying the concrete path flags to the front elevation and repairing the cracks of the damaged concrete hardstanding areas.

Guideline budget

£ 10,500

Further investigation

 

Chimney Stacks

A roofing contractor should be asked to inspect this chimney stack, commenting in particular on the flashings and the bedding of the chimney pots.

Main Walls

A cavity wall tie specialist should be asked to inspect left hand gable to property and comment on any remedial works required.

Walls, Partitions and Plasterwork

A BWPDA Timber and Damp Proofing specialist should be asked to inspect the property and comment on remedial works required to remedy rising/penetrating dampness.

Fireplaces, Flues and Chimney Breasts

A CORGI approved engineer should be asked to inspect gas fires.

Electricity

An inspection and test by an NICEIC approved electrical contractor is required with a view to updating this installation.

Heating

We are not heating engineers and would recommend a test and inspection of the boiler and hot water system be carried out by a CORGI approved heating engineer prior to exchange of contracts.

Dampness

A BWPDA timber and damp proofing specialist should be asked to inspect the property and comment on remedying the rising and penetrating dampness to the property. This may involve some internal re-plastering.

Guideline budget

£ 750 for inspection and test only. 

Environmental matters

 

Comments

We are not aware of any adverse environmental factors affecting this property.

Matters for your Solicitor

 

Planning

No enquiries have been made of the Local Authority in connection with Planning matters.  You should ask your Solicitor to advise you in this respect.

Building Regulations

No enquiries have been made of the Local Authority in connection with Building Regulation matters.  You should ask your Solicitor to advise you in this respect.

Roads

No enquiries have been made of the Local Authority in connection with the road.  You should ask your Solicitor to advise you in this respect.

Rights of way

No enquiries have been made of the Local Authority in connection with rights of way.  You should ask your Solicitor to advise you in this respect.

 

Surveyor

P Naylor MRICS

 

 

 

Signed

 

 

 

……………………………………………………………………………………..

For Trafford Surveyors Ltd

2  Instruction

Trafford Surveyors’ reference

 

Instruction from

 

Date of instruction

 

Date of inspection

 

Weather

At the time of inspection it was raining with similar periods preceding.

 

Furnished or unfurnished

At the time of inspection the property was fully furnished with fitted floor coverings throughout. Some areas were particularly cluttered with household goods and storage items, for example in the cellar and several of the attic rooms, making inspection of these areas difficult.

 

Occupancy

I understand that the property is single occupancy.  However during my inspection, I noted several rooms with locks fitted where possibly informal tenancy arrangements exist. 

 

The vendor and several members of the family were in occupation during my inspection.

 

Orientation

For the purpose of description within this report, all directions are given as facing the front elevation of the property.

 

Date of report

 

3  Survey Report

Exterior

 

Chimney stacks

 

Description

There were two brick chimney stacks to the property.  These were of brick bedded on sand and cement mortar with lead flashings and clay pots or gas flue terminals fitted.   

Condition

The main stack to the front right hand elevation was shared with the adjoining property.  This was difficult to inspect from my ground floor inspection due to the height and position of the roofs and a tree, however, I noted there was some open jointed brickwork.  I could not see the flashings to comment. 

 

To the front left hand side of the main two-storey section was a brick chimney stack with lead flashings.  This chimney stack was in poor condition with ferns and vegetation growing out of the mortar joints and the lead flashings appear to be coming away.

Essential Repairs

Re-point the front left-hand chimney stack and overhaul the lead flashings, replacing missing sections.

Further Investigation

A roofing contractor should be asked to inspect this chimney stack, commenting in particular on the flashings and the bedding of the chimney pot.

Main roof coverings

 

Description

The main roof is of pitched and hipped construction with a small dormer to the front elevation.  The roof steps down from the three storey to the two storey section. 

 

The roof was covered in concrete interlocking tiles with matching ridge tiles.

 

The dormer roof has mineral felt ‘cheeks’.

Condition

The roof surface was in particularly poor condition with some slipped and broken tiles noted, the ridge tiles appeared loose and open-jointed.

 

The sand and cement pointing to the verges had come away.

 

The valley gutter appeared to be lined with lead, however I could not see the full extent of this gutter from my ground floor inspection and I could not see the secret valley gutter where this property adjoins the neighbour’s.

Serious Defects

The roof surface was in particularly poor condition and a major overhaul is required replacing slipped and broken concrete tiles, re-bedding and re-pointing ridge tiles and verges, and, once an inspection has been carried out of the valley gutters, no doubt these will require re-lining.  The lead upstand flashings where the two-storey section meets the three-storey brick wall will also require a major overhaul, repairing and replacing lead flashing.

 

It may prove cost-effective to re-roof the whole property.

Secondary roof coverings

 

Description

There are flat roofs to the front two-storey bay, porch and cloakroom and rear two-storey bay.

Condition

These roofs require a major overhaul replacing the mineral felt covering and the temporary ‘flashband’ repairs.

Serious Defects

Re-cover all secondary roofs.  Note:  mineral felt and ‘flashband’ type coverings only have a limited life and are only viewed as temporary repairs.  These areas should now be re-covered.

Roof drainage

 

Description

Roof drainage to the property comprises a mixture of uPVC and cast iron gutters and downspouts discharging to gullies to the front and rear.

Condition

The roof drainage was in poor condition with broken, missing and mis-aligned sections.  The older cast iron sections were cracked and rusting.

 

The gullies to the front and rear were blocked and over-flowing and should be cleared out and grids provided.

Serious Defects

The gutters and downspouts should be replaced and the grids and gullies cleared and grids provided.

Eaves, fascias, soffits

 

Description

These comprised painted timber fascias and soffits.

Condition

These features were in poor condition with split, rotten and missing sections noted, for example to the left hand side of the two-storey gable.

Other Repairs

Overhaul or replace timber fascias.  It may prove cost-effective to replace these with modern uPVC sections which do not require any ongoing maintenance.

Roof Space Ventilation

 

Description

There is no roof space ventilation, the roof relies on natural ventilation.

Condition

Comments given on internal inspection, however if re-roofing this property, permanent roof space ventilation should be provided in the form of ridge vents or similar.

Main walls

 

Description

The main walls to the property appear to comprise of a mixture of solid and ‘finger cavity’ brickwork bedded on sand and cement mortar which has been painted, hindering my inspection of the brickwork beneath.

Condition

The brickwork appeared in satisfactory condition as far as I could ascertain.  The gable to the left hand side of the property had bulged slightly to the cavity brickwork and I would recommend a cavity wall tie specialist inspect the property and comment on any remedial works required in this area.

Further Investigation

Cavity wall tie specialist to inspect left hand gable to property and comment on any remedial works required.


 

Sub-floor ventilation

 

Description

We noted air bricks surrounding the property and cellar steps.   These will provide ventilation to the cellar areas beneath the ground floor timbers.

Condition

These appeared in acceptable condition.  However, additional ventilation may be required to the cellar area.  Comments are given on my internal inspection.

Damp proof course